Live1.Development of RHD Main Road to Banglabazar Internal Old Road Under PM Khali Union,Sadar,Coxsbazar…
Source checked 31 Aug 2026
Office of the Upazila Engineer, Cox's Bazar Sadar, Cox's Bazar
Building works
WorksCox's Bazar
৳80,000
1 Sept 2026, 12:00 pmCloses tomorrow
LiveConstruction of RCC Retaining Wall beside Gupta Khal at 40 no Ward under Zone-06
Source checked 31 Aug 2026
Office of Superintendent Engineer (Zone-4,6)
Building works
WorksChattogram
৳9,50,000
3 Sept 2026, 02:30 pmCloses in 3 days
LiveConstruction of Internal Road at Sylhet Mohila Polytechnic Institute, Dakshin Surma, Sylhet.
Source checked 31 Aug 2026
Office of the Executive Engineer, EED, Sylhet, District.
Building works
WorksSylhet
৳3,00,000
3 Sept 2026, 12:00 pmCloses in 3 days
LiveConstruction of Drain at Sylhet Mohila Polytechnic Institute, Dakshin Surma, Sylhet.
Source checked 31 Aug 2026
Office of the Executive Engineer, EED, Sylhet, District.
Building works
WorksSylhet
৳3,50,000
3 Sept 2026, 12:00 pmCloses in 3 days
LiveCONSTRUCTION OF 05-STORIED TEACHER'S OFFICER'S DORMITORY WITH 05-STORIED FOUNDATION INCLUDING SANITARY, WATER…
Source checked 31 Aug 2026
Office of the Executive Engineer, EED, Thakurgaaon District.
Water & sanitation works
WorksThakurgaon
৳15,00,000
16 Sept 2026, 11:00 amCloses in 16 days
Live(1) Construction of RCC Road from Pagar Joimot Khan Road to Morkun Godhara Ghat via Pagar Tech Para. . (2)…
Source checked 31 Aug 2026
Widening of main connecting road in various zone including construction drain & footpath at Gazipur city corporation. (1st Revision)
Building works
WorksGazipur
৳55,00,000
6 Sept 2026, 02:00 pmCloses in 6 days
LiveGrass & Jungle Cutting in the KPI area, removing small plants in switchyard, Trimming tree branches around 132KV…
Source checked 31 Aug 2026
Executive Engineer ( MMD & Civil Division ) Baghabari Power Station.
৳35,000
2 Sept 2026, 11:00 amCloses in 2 days
LiveConstruction of Permanent Steel Canopies on the Elevated Expressway for Toll Plazas at Different Locations…
Source checked 31 Aug 2026
Project Director(Elevated ExpressWay)
Steel & rebar
WorksChattogram
৳23,00,000
9 Sept 2026, 03:00 pmCloses in 9 days
LiveConstruction of 4 (Four) Storied Upazila Dormitory Building under Lalmai, Cumilla
Source checked 31 Aug 2026
Office of the Upazila Engineer, LGED, Lalmai, Cumilla.
Building works
WorksCumilla
৳7,00,000
9 Sept 2026, 03:00 pmCloses in 9 days
LiveRe-sectioning of Alamdanga main Irrigation canal from Km 58.000 to Km 62.000 = 4.000 Km in c/w "Emergency…
Source checked 31 Aug 2026
Building works
WorksMagura
৳2,50,000
2 Sept 2026, 10:00 amCloses in 2 days
LivePeriodic Maintenance Programme (PMP) for Partial Strengthening, Rigid Pavement, Surfacing by DBS Wearing Coarse…
Source checked 31 Aug 2026
Building works
WorksNoakhali
৳30,00,000
2 Sept 2026, 12:00 pmCloses in 2 days
LiveConstruction of 1-storied academic building with 4-storeid foundation at Mirkamari Adorsho Alim Madrasha…
Source checked 31 Aug 2026
Office of the Executive Engineer, EED,Pabna, District.
৳3,60,000
1 Sept 2026, 03:00 pmCloses tomorrow
LiveSupply of Machineries & Equipments (Machineris for Industrial Production Engineering Lab)
Source checked 31 Aug 2026
Planning and Development (PnD)
৳32,000
1 Sept 2026, 02:00 pmCloses tomorrow
LiveSupply, Installation, Testing And Commissioning Of 500-KVA Electric Sub-Station & Construction of Sub-Station…
Source checked 31 Aug 2026
Office of the Executive Engineer, EED, Natore District.
Building works
WorksNatore
৳4,00,000
3 Sept 2026, 12:00 pmCloses in 3 days
LiveSupply of Centrifugal Pump for Injection Water System and Cemtrifugal Pump for Spray Water System.
Source checked 31 Aug 2026
৳4,00,000
24 Sept 2026, 12:00 pmCloses in 24 days
LiveInstallation of a Centralized Online UPS Solution Including Supply of Necessary Goods to Support Comprehensive…
Source checked 31 Aug 2026
৳10,00,000
10 Sept 2026, 02:30 pmCloses in 10 days
LiveImprovement of Surjapur Bazar - Border (Kachuachura Chowasta) Road at Ch.00-2000 m under Haluaghat Upazila…
Source checked 31 Aug 2026
Office of the Executive Engineer, LGED, Mymensingh
Building works
WorksMymensingh
৳5,60,000
1 Sept 2026, 02:00 pmCloses tomorrow
LiveConstruction of 3-class 1 storied academic building with 4-storied foundation in/c. sanitary, water supply &…
Source checked 31 Aug 2026
Office of the Executive Engineer, EED, Gazipur District.
Water & sanitation works
WorksGazipur
৳3,75,000
7 Sept 2026, 04:30 pmCloses in 7 days
LivePart-A: Improvement of Balua Chowmohoni-Chiliona Bazar via Chilitali Madrasha Road at Ch: 2070-2700m (Road ID…
Source checked 31 Aug 2026
Office of the Executive Engineer, LGED, Cumilla
Building works
WorksCumilla
৳8,61,000
2 Sept 2026, 12:30 pmCloses in 2 days
LivePart-A: Improvement of Goalgaon UP-Dakhin Himmatpur-Kamalpur Road at Ch: 783-1350m (Road ID: 419914127) (Salvage…
Source checked 31 Aug 2026
Office of the Executive Engineer, LGED, Cumilla
Building works
WorksCumilla
৳11,75,000
2 Sept 2026, 12:30 pmCloses in 2 days
LiveProcurement of Chemical Re-agent for the F.Y 2026-2027 at 250 Bed District Hospital, Joypurhat.
Source checked 31 Aug 2026
Joypurhat District Hospital
Network equipment
GoodsJoypurhat
৳3,00,000
7 Sept 2026, 02:00 pmCloses in 7 days
LiveProcurement of Server for Digital Services Department for Recruitment Services.
Source checked 31 Aug 2026
Teletalk Bangladesh Limited
Software & IT services
GoodsDhaka
৳1,50,000
1 Sept 2026, 02:30 pmCloses tomorrow
LiveAs per Tender Notice, TDS or 23/05/2026 Upazila Monthly Regulation Copy.
Source checked 31 Aug 2026
Office Of The Upazila Engineer, Bhanga, Faridpur
Building works
WorksFaridpur
৳92,000
2 Sept 2026, 12:00 pmCloses in 2 days
LiveConstruction of 1380 ( One Thousand Three Hundred & Eighty) Nos. Improved Latrines (Twin Pit Latrines) for the…
Source checked 31 Aug 2026
Building works
WorksJamalpur
৳23,00,000
9 Sept 2026, 12:00 pmCloses in 9 days
LiveAs per Tender Notice, TDS or 23/05/2026 Upazila Monthly Regulation Copy.
Source checked 31 Aug 2026
Office Of The Upazila Engineer, Bhanga, Faridpur
Building works
WorksFaridpur
৳1,10,000
2 Sept 2026, 12:00 pmCloses in 2 days