LiveConstruction of Single Storied Academic Building with Four Storied Foundation Including Sanitary Water Supply &…
Source checked 31 Aug 2026
Office of the Executive Engineer, EED,Kishoreganj, District.
Water & sanitation works
WorksKishoreganj
৳2,50,000
17 Sept 2026, 04:00 pmCloses in 17 days
LiveConstruction of Single Storied Academic Building with Four Storied Foundation Including Sanitary Water Supply &…
Source checked 31 Aug 2026
Office of the Executive Engineer, EED,Kishoreganj, District.
Water & sanitation works
WorksKishoreganj
৳2,50,000
17 Sept 2026, 04:00 pmCloses in 17 days
LiveVertical Extension of Existing Single Storied Academic Building with 4-Storied foundation including Sanitary…
Source checked 31 Aug 2026
Office of the Executive Engineer, EED,Kishoreganj, District.
Water & sanitation works
WorksKishoreganj
৳2,50,000
17 Sept 2026, 04:00 pmCloses in 17 days
LivePainting and related repair work inside the flats no-7/S, 11/M, 15/6, 21/9, 26/B of buildings no. 7, 11, 15, 21…
Source checked 31 Aug 2026
Dhaka PWD Division-2, Segunbagicha,Dhaka
৳25,000
10 Sept 2026, 05:00 pmCloses in 10 days
LiveRenovation of the interior of various rooms of flats no. 1/D, 1/G located in the government residential area on…
Source checked 31 Aug 2026
Dhaka PWD Division-2, Segunbagicha,Dhaka
৳25,000
10 Sept 2026, 05:00 pmCloses in 10 days
LiveVertical Extension of Science Building With Construction works of Internal Drain and Road (RMS ID: 1051198) at…
Source checked 31 Aug 2026
Office of the Executive Engineer, EED,Kishoreganj, District.
Building works
WorksKishoreganj
৳2,50,000
17 Sept 2026, 04:00 pmCloses in 17 days
LiveEstablishment of 50 (Fifty) Technical Training Centre at Upazilla Level one at Moheshpur, Jhenaidah (Sub-Head…
Source checked 31 Aug 2026
Building works
WorksJhenaidah
৳78,00,000
30 Sept 2026, 12:30 pmCloses in 30 days
LiveServicing, repair, and maintenance with routine checkup of all air conditioners at BIWTA Bhaban.
Source checked 31 Aug 2026
Office of the Executive Engineer, Planning & Design Circle-1
Repair & maintenance
WorksDhaka
৳35,000
16 Sept 2026, 12:00 pmCloses in 16 days
LiveTo supply necessary spares and perform engine overhauling of Forklift
Source checked 31 Aug 2026
৳16,500
16 Sept 2026, 03:00 pmCloses in 16 days
LiveConstruction of Carp Hatchery Unit with Deep Tube Well and Overhead Water Tank at Carp Hatchery Complex…
Source checked 31 Aug 2026
Increasing Fish Production and Capacity Building through Infrastucture Development of Existing Govt. Fish Farm Project (1st Phase)
৳5,00,000
15 Sept 2026, 01:00 pmCloses in 15 days
LiveRenovation and Repair Works of North-East block of Engineering Division (1st Floor) at BAEC-HQ
Source checked 31 Aug 2026
Bangladesh Atomic Energy Commission (BAEC HQ)
৳22,000
13 Sept 2026, 03:30 pmCloses in 13 days
LiveConstruction work to close the gap above the 5-inch wall of the existing Barrack No. 03 in DMP's Western…
Source checked 31 Aug 2026
Development Section, Dhaka Metropoliton Police, Dhaka
৳10,000
15 Sept 2026, 03:00 pmCloses in 15 days
LiveOverall repair work of inside and outside of the 5-storied Barrack Building No. 04 of DMP's POM Police Lines in…
Source checked 31 Aug 2026
Development Section, Dhaka Metropoliton Police, Dhaka
৳88,500
15 Sept 2026, 03:00 pmCloses in 15 days
Live64TSC/Road-20: Construction of Connecting Internal R.C.C Road From Administrative Building to New Academic…
Source checked 31 Aug 2026
Office of the Executive Engineer, EED,Cox's Bazar, District.
Building works
WorksCox's Bazar
৳1,20,000
17 Sept 2026, 12:00 pmCloses in 17 days
LiveSpecial repair work on the ground floor balcony tiles and from the 1st to 5th floor of women's barrack of Police…
Source checked 31 Aug 2026
Development Section, Dhaka Metropoliton Police, Dhaka
৳45,000
15 Sept 2026, 03:00 pmCloses in 15 days
LiveWidening & Strengthening of Eid Gaon G.C - Gomatoli Jety Bazar Via Gomatoli Bazar Road from Ch. 5130-8870m by BC…
Source checked 31 Aug 2026
Office of the Executive Engineer, LGED, Cox'sbazar
Building works
WorksCox's Bazar
৳40,00,000
23 Sept 2026, 04:00 pmCloses in 23 days
LiveImprovement of Road by Uni-Block Kushura Dhantara UZR add Vilkusnai Tempo Stand to Gomgram Bazar Road at Ch…
Source checked 31 Aug 2026
Office of the Executive Engineer, LGED, Dhaka
৳4,40,000
16 Sept 2026, 12:00 pmCloses in 16 days
LiveImprovement of Road by Uni-Block from Sanggur Bazar to Mohonpur Khaya Ghat Road at Ch: 00- 1230m (Road ID No.…
Source checked 31 Aug 2026
Office of the Executive Engineer, LGED, Dhaka
৳4,50,000
16 Sept 2026, 12:00 pmCloses in 16 days
LivePart-A: Improvement of Road by BC from Makor Khola Mosque- Boratia Road at Ch: 00- 2600m Under Dhamrai Upazila…
Source checked 31 Aug 2026
Office of the Executive Engineer, LGED, Dhaka
৳8,30,000
16 Sept 2026, 12:00 pmCloses in 16 days
LiveImprovement of Road by RCC from Jamirabari- Jadabpur Kayed Ali Shop's at Ch: 00- 1500m (Road ID No. 326145247)…
Source checked 31 Aug 2026
Office of the Executive Engineer, LGED, Dhaka
৳8,50,000
16 Sept 2026, 12:00 pmCloses in 16 days
LiveImprovement of Road by Uni-Block from Baishakanda UP- Golakanda Utter Para Road at Ch: 1000- 2100m (Road ID No.…
Source checked 31 Aug 2026
Office of the Executive Engineer, LGED, Dhaka
৳5,10,000
16 Sept 2026, 12:00 pmCloses in 16 days
LiveDevelopment of Monsurabad by lane and Foju Mia by lane at 24 No North Agrabad Ward
Source checked 31 Aug 2026
Office of Superintendent Engineer (Zone-4,6)
Building works
WorksChattogram
৳1,75,000
10 Sept 2026, 03:00 pmCloses in 10 days
LiveRe-construction of existing platform shed, size-(50'-0"x 26'- 0") and extension of platform shed size-(25'…
Source checked 31 Aug 2026
Office of the Chief Engineer (West), Rajshahi
Building works
WorksRajshahi
৳1,80,000
16 Sept 2026, 12:00 pmCloses in 16 days
LiveIn SSAE/BW/SDP section: Sinking of Deep Tube well with water supply pipe line including construction of pump…
Source checked 31 Aug 2026
Office of the Chief Engineer (West), Rajshahi
Water & sanitation works
WorksRajshahi
৳1,40,000
16 Sept 2026, 12:00 pmCloses in 16 days
LiveRe-wiring and interior renovation work at Tigerpass Chattogram City Corporation Head office room no. 215 (legal…
Source checked 31 Aug 2026
Office of Executive Engineer, Electrical-2
Repair & maintenance
GoodsChattogram
৳20,000
14 Sept 2026, 02:00 pmCloses in 14 days