LiveInstallation of Deep Tube Well with No. 6 Hand Pump under Project for Safe Water Supply Throughout the Country…
Source checked 31 Aug 2026
Office of the Executive Engineer DPHE, Lakshmipur
Water & sanitation works
WorksLaksmipur
৳5,00,000
2 Sept 2026, 12:00 pmCloses in 2 days
LiveRe-sectioning of Alamdanga main Irrigation canal from Km 58.000 to Km 62.000 = 4.000 Km in c/w "Emergency…
Source checked 31 Aug 2026
Building works
WorksMagura
৳2,50,000
2 Sept 2026, 10:00 amCloses in 2 days
LiveConstruction of railing on Maheshkhal guide wall at 36 No Gosaildanga Ward
Source checked 31 Aug 2026
Office of Superintendent Engineer (Zone-4,6)
Building works
WorksChattogram
৳1,07,500
10 Sept 2026, 03:00 pmCloses in 10 days
LivePeriodic Maintenance Programme (PMP) (Roads) for Widening & Strengthening with DBS Wearing Course of existing…
Source checked 31 Aug 2026
৳30,00,000
2 Sept 2026, 01:00 pmCloses in 2 days
LiveRepair work of ground floor balcony tiles and special repair work from 1st to 5th floor of Barrack No. 5 of…
Source checked 31 Aug 2026
Development Section, Dhaka Metropoliton Police, Dhaka
৳30,000
15 Sept 2026, 03:00 pmCloses in 15 days
LivePart-1 : Improvement of Road from Khairabad hat (Garuria UP Office) to Daporkati Bazar (godown) Via Nilganj Hat…
Source checked 31 Aug 2026
Office of the Executive Engineer, LGED, Barishal
Building works
WorksBarishal
৳9,00,000
16 Sept 2026, 01:00 pmCloses in 16 days
LiveOverall repair work of the roof of Barrack Building No. 05 of DMP's POM Police Lines in Mirpur.
Source checked 31 Aug 2026
Development Section, Dhaka Metropoliton Police, Dhaka
৳34,000
15 Sept 2026, 03:00 pmCloses in 15 days
LivePeriodic Maintenance Programme (PMP) for DBS Wearing Course with Partial Strengthening & Construction of Rigid…
Source checked 31 Aug 2026
৳39,00,000
2 Sept 2026, 01:00 pmCloses in 2 days
LiveCutting jungles and Shurb including removing and cleaning the spot/site at different Km (p) of 1.…
Source checked 31 Aug 2026
৳55,000
14 Sept 2026, 12:00 pmCloses in 14 days
LiveImprovement of Road by Uni-Block from Kaknait- Shithi Village- Noagaokait Road at Ch: 1500- 2155m (Road ID No.…
Source checked 31 Aug 2026
Office of the Executive Engineer, LGED, Dhaka
৳2,60,000
16 Sept 2026, 12:00 pmCloses in 16 days
LivePeriodic Maintenance Programme (PMP) work by DBS Wearing Course, Protective work & Sign Signal Work from Ch…
Source checked 31 Aug 2026
Building works
WorksChandpur
৳70,00,000
2 Sept 2026, 12:00 pmCloses in 2 days
LiveSupplying of Asphalt Materials (Wearing Course) for Emergency Routine Maintenance Work at Baraiyarhat-Jorargonj…
Source checked 31 Aug 2026
৳75,000
14 Sept 2026, 12:00 pmCloses in 14 days
LiveInstallation works of Thai-aluminum windows on the ground floor of the Kishoreganj Deputy Commissioner's…
Source checked 31 Aug 2026
Furniture
WorksKishoreganj
৳30,000
7 Sept 2026, 04:00 pmCloses in 7 days
LiveConstruction of 3-class 1 storied academic building with 4-storied foundation in/c. sanitary, water supply &…
Source checked 31 Aug 2026
Office of the Executive Engineer, EED, Gazipur District.
Water & sanitation works
WorksGazipur
৳3,75,000
7 Sept 2026, 04:30 pmCloses in 7 days
LivePeriodic Maintenance Programme (PMP) for Construction of Rigid Pavement and Uni-Block Pavement works at Ch.…
Source checked 31 Aug 2026
Building works
WorksNoakhali
৳25,00,000
2 Sept 2026, 12:15 pmCloses in 2 days
LivePeriodic Maintenance Programme (PMP) for Strengthening, DBS Wearing Course & Protective work at Ch. 0+000…
Source checked 31 Aug 2026
Brick, sand & stone
WorksNoakhali
৳40,00,000
2 Sept 2026, 12:15 pmCloses in 2 days
LiveConstruction of Permanent Steel Canopies on the Elevated Expressway for Toll Plazas at Different Locations…
Source checked 31 Aug 2026
Project Director(Elevated ExpressWay)
Steel & rebar
WorksChattogram
৳23,00,000
9 Sept 2026, 03:00 pmCloses in 9 days
LiveDevelopment of Panpatti Fish Market, Golachipa, Patuakhali.
Source checked 31 Aug 2026
Climate Smart Agriculture and Water Management Project (DoF Part)
৳4,00,000
16 Sept 2026, 02:00 pmCloses in 16 days
LivePeriodic Maintenance Programme (PMP) for DBS Wearing Course & Protective works at Ch. 01+300m (Maijdee) to Ch.…
Source checked 31 Aug 2026
Building works
WorksNoakhali
৳45,00,000
2 Sept 2026, 12:15 pmCloses in 2 days
LiveConstruction of work of Muradia UP Complex building in Dumki upazila of Patuakhali district.
Source checked 31 Aug 2026
Office of the Upazila Engineer, LGED, Dumki, Patuakhali
Building works
WorksPatuakhali
৳12,00,000
14 Sept 2026, 12:00 pmCloses in 14 days
LiveRepairing work Banglabazar and Khurushkul Time Bazar Shed & infrastructure at Coxsbazar Sadar Upazila,District…
Source checked 31 Aug 2026
Office of the Upazila Engineer, Cox's Bazar Sadar, Cox's Bazar
Building works
WorksCox's Bazar
৳50,000
1 Sept 2026, 12:00 pmCloses tomorrow
LivePeriodic Maintenance Programme (PMP) for DBS Wearing course, Sign-Signal & Protective work at Ch. 0+400m…
Source checked 31 Aug 2026
Building works
WorksNoakhali
৳25,00,000
2 Sept 2026, 12:15 pmCloses in 2 days
LiveLand development work along with Brick Flat Soling & HBB Work in road and construction of 2 nos Box Culvert at…
Source checked 31 Aug 2026
Brick, sand & stone
WorksDhaka
৳17,00,000
7 Sept 2026, 02:00 pmCloses in 7 days
LiveConstruction of Boundary wall at RPRS, BARI, Madaripur under Strengthening Regional Pulse Research Station…
Source checked 31 Aug 2026
Buildings & Grounds Section
Building works
WorksGazipur
৳16,35,000
23 Sept 2026, 12:00 pmCloses in 23 days
LiveLand Development 1) Removal & Replacement of Top-Soil 2) By Dredging with Silt Soil 3) By Loam Soil at RPRS…
Source checked 31 Aug 2026
Buildings & Grounds Section
Building works
WorksGazipur
৳26,50,000
22 Sept 2026, 12:00 pmCloses in 22 days